亚洲精品美女久久久久99,成人免费午夜视频,中文字幕成人网,www.色综合.com

Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
为什么每年都会怀念张国荣| 男子赠妻子闺蜜7万被判全额返还加利息| 马龙说全运会后还想参加比赛 | 吴柳芳发博过三月三| 国家标准住宅项目规范发布| 公孙离FMVP皮肤| 韩国庄仕洋| 心理师锐评赵露思新综艺| 李昀锐好标准的体育生下楼梯| 男子赠妻子闺蜜7万被判全额返还加利息 | 少吃水果少生很多病不具有普遍性 | 50万竟然买了4辆宝马| 为什么每年都会怀念张国荣| 李现的微博逐渐奇怪| 缅甸地震已遇难2065人| 横店变竖店了| 公孙离FMVP皮肤| 4月一起加油| 难哄3月全网播放冠军| 时代少年团 录播| 好房子的新标准来了 | 韩国庄仕洋| 站姐愚人节团建预告| 找工作不要限制于招聘app| 站姐愚人节团建预告| 李现又去公园打鸟了| 男子用非遗茶杯吹奏广西民歌| 沉浸式感受广西三月三| 黄子弘凡剧透了一首非常丰富的歌| 4月一起加油| newjeans未来该何去何从| 申请过国家助学贷款的同学注意了 | newjeans未来该何去何从| 甲亢哥被喷火表演吓到尖叫 | 50万竟然买了4辆宝马| 特朗普推进俄乌停火或遭显著挫败| 日本特大地震若发生或致近30万人死亡 | 女装啥时候能回归正常审美| 4月一起加油| 中医把脉称甲亢哥没有甲亢| 全圆佑直播|