亚洲精品美女久久久久99,成人免费午夜视频,中文字幕成人网,www.色综合.com

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
黄霄雲方回应翻唱争议| 周雨彤去冰岛了| 张凌赫设计的竹节包什么样| 韩国庄仕洋| 愚人节文案| 中国咖啡98%来自云南| 甲亢哥成都行直播| 4层及以上住宅设电梯 | 金秀贤记者会最起鸡皮疙瘩的一句话| 难哄3月全网播放冠军| 檀健次 帕拉丁| 好房子的新标准来了| 甲亢哥成都行直播| 男子发现打工养了7年的女儿非亲生| KPL春日特别团建企划| 韩国庄仕洋| 为什么每年都会怀念张国荣| 金秀贤公开录音证据| 安徽官方辟谣新初一取消中考小四门 | 4层及以上住宅设电梯| 国家标准住宅项目规范发布| 檀健次当评委了| 雷军摄影夜校迎来首批毕业生| 少吃水果少生很多病不具有普遍性| 门童泰国事件金秀贤记者会直播| 檀健次当评委了| 横店变竖店了| 张檬称月子要坐满100天| 慎买带有QS标志产品| 白敬亭 宋轶| newjeans是高层内斗的牺牲品吗| 男子赠妻子闺蜜7万被判全额返还加利息| 李现又去公园打鸟了| 10元盒饭姐喊话浪费顾客一辈子别来| 李现又去公园打鸟了| 男子发现打工养了7年的女儿非亲生| 2024的愚人节勇士站姐| 沉浸式感受广西三月三| 愚人节文案| 金秀贤记者会直播| 男子肝癌晚期只打一针获新生|